PUCs and PSCs are independent regulatory organizations appointed via the point out legislature. Turbines can only be developed with approval in the PUC or PSC, and these organizations set correct energy charges within their condition the utilities need to abide by [2]. New power lines are also desired to keep up the electrical system's General t